Gallery
1
Gallery
2
|








|
ACTUAL PICS OF
WORKS DONE BY US
Page 1 | Page
2
|

|
|
Olympic Size swimming
pool erected, tested and commissioned by Chlorination
Engineering for the Samartha
Nagar Co- op Housing Society Limited, Lokhandwala
Complex, Anderi (w). complete equipments and accessories have been imported and are as per latest international standards.
The Olympic size Swimming Pool at Lokhandwala is one of the very few Olympic Size Swimming Pool In india to be
Ozonated making it a Chemical Free pool. Ozone plant supplied and commissioned
by Chlorination engineering.,
The only Second Olympic size Swimming Pool In Mumbai &
Maharashtra to be Ozonated
|
|
|
 

|
|
Olympic Size swimming Pool 50M X 25M X 2M Even depth designed, supplied, erected, tested and commissioned by
Chlorination Engineering at Kalinga stadium, Bhubaneshwar, Orissa. using latest state
of the art technology filtration unit. filters imported from Spain and all the accessories as per
international Standards. the pool was inaugurated by the CM of Orissa Shri Naveen
Patnaik on 4th march 2006 the work was carried out for the sports dept. |
|
|